RMIT Develops New Fire Safety Training to Address Renewable Energy Risks in Victoria

RMIT is developing renewable energy fire safety training microcredentials to help engineers and surveyors manage battery, solar, and connected energy risks.
NSW Clarifies Electrical Alterations and Repairs Under AS/NZS 3000:2018
Understand electrical alteration versus repair under NSW guidance, covering wiring, protection, and RCD assessment for compliant work.
Older Rooftop Solar Systems Linked to Nearly Two-Thirds of Solar-Related House Fires in Victoria

Discover solar system maintenance fire prevention tips for older rooftop systems, including licensed servicing and property safety reviews.
Updated Standard for Emergency Lighting and Exit Sign Systems in Australia
Plan AS NZS 2293.1 emergency lighting installation projects with edition checks, compliance guidance, and B2B supply support.
South Australia Introduces New Fire Safety Requirements for EV Charging Stations

Learn MBS 013 requirements for EV charging fire safety isolation signage, master isolation, and hose reel warnings for compliant EV chargers.
Victoria Introduces New Electric Line Clearance Regulations 2026 to Reduce Bushfire Risks

Learn how the electric line clearance regulation decision signals changes for fire and electrical sites, plus readiness steps for final rules.
Suncorp Reports 806 House Fire Insurance Claims Across Australia in 2025

Explore house fire insurance smoke alarm research from Suncorp data, with 2025 Australian hotspot claims and maintenance tips.
Australian Hospital Study Reports 1,000-Fold Reduction in Bushfire Smoke

Adelaide University hospital bushfire smoke filtration research reported a ~1,000-fold smoke reduction and 34% lower energy use.
Queensland Extends Fire Protection Licensing Deadlines to 2035

See how the fire protection licensing transition 2035 changes Queensland licensing, upskilling, and compliance planning for contractors and facility teams.
FRNSW Issues New Fire Safety Position for Lithium-Ion Batteries and Diesel Generators in Data Centres

Review FRNSW guidance on data centre battery room fire separation, preferred 4-hour construction, ESS sprinkler testing, and stacked diesel generators.