Fire Hydrant Systems & Jacking Pumps Logbook

Fire Hydrant Systems & Jacking Pumps Logbook

Description

BFHS-JP — Fire Hydrant Systems & Jacking Pumps Logbook

A practical two-year logbook designed for recording routine service activities for fire hydrant systems and associated jacking pumps, in accordance with AS 1851—2012 (Incorporating Amendment 1). It provides dedicated fields for hydrant and booster inspections, pump starting pressures, pressure-reducing valves, water supply proving tests, hydrostatic and flow tests, jacking pump operation, defects and corrective actions, helping technicians maintain clear and consistent service records.

 

Specifications

Specification Details
Product Name Fire Hydrant Systems & Jacking Pumps Logbook
Product Code BFHS-JP
Size 225 × 148 mm
Copy Type 3-Part Carbonless
Copies White – Owner / Occupier / Agent · Yellow – Service Provider · Red – Book Copy
Record Period 2 Years
Standard AS 1851—2012 – Routine Service of Fire Protection Systems & Equipment (Incorporating Amendment 1)
Service Intervals Monthly · Six-Monthly · Yearly · Five-Yearly
Applicable Systems Fire Hydrant Systems · Above-Ground & Below-Ground Hydrants · Booster Assemblies · Pressure-Reducing / Pressure-Relief Valves · Jacking Pumps
Relevant Standard Sections AS 1851—2012, Section 4 – Fire Hydrant Systems · Section 3 – Fire Pumpsets
Relevant Service Schedules Tables 4.4.1, 4.4.2, 4.4.3, 4.4.4, 3.4.5.1 and 3.4.5.2
Additional Records Diesel & Electric Pump Starting Pressures · Battery & Charger Condition · Jacking Pump Cut-In / Cut-Out Pressures · Low-Side Pressure Readings · Water Supply Proving Tests · Pressure-Reducing / Relief Valve Tests · Booster Connection Flow Test · Hydrostatic Test · Defects / Corrective Actions · Notes
Writing Shield Included to help prevent transfer onto following carbonless pages.