Table of Contents
ToggleWhen a building loses mains power, people rely on emergency lights and running-man signs to point them out safely. In Australia the benchmark for that equipment is AS 2293, referenced by the National Construction Code (NCC) and enforced by every state fire authority. What follows is a concise guide to the rule set, the latest amendments, and the practical choices that help owners keep both occupants and auditors happy.
Anatomy of the standard
AS/NZS 2293 comprises three companion parts:
- Part 1 (2018, Amd 1 2021) – design, installation and commissioning requirements, adopted in NCC 2022
- Part 2 (2019) – routine inspection and maintenance rules
- Part 3 (2018) – performance tests for emergency luminaires and exit signs.
Together they form a life-cycle loop: build to Part 1, verify hardware with Part 3, and keep the system compliant through the Part 2 schedule.
Core design rules
Part 1 pursues one aim—unbroken visibility along every exit path. Key figures:
- Minimum illuminance: 0.2 lux on the centreline of an escape route.
- Uniformity: brightest-to-darkest ratio no greater than 40 : 1.
- Mounting height: signs 2 m–2.7 m above floor or directly over the door.
- Viewing distance: eight times the letter height of the pictogram.
Amendment 1 introduced lumen-depreciation curves for stairwells and stricter labelling for lithium batteries, reflecting the surge in LED uptake.
NCC triggers
The NCC, specifically Section E4, dictates where emergency lighting is mandatory. Expect to fit compliant luminaires in fire-isolated stairs, long corridors, rooms over 100 m², and all Class 6 premises above 100 m². Exit signs must hang over every required egress door and at points where an escape path changes direction. Certifiers use AS 2293 to judge whether those fittings do their job.
Maintenance made simple
Part 2 strips guesswork from upkeep:
| Interval | Action | Purpose |
| Monthly | Visual check | Spot damage or lamp faults. |
| Six-monthly | 90-minute discharge test | Prove battery capacity and recharge. |
| Annually | Clean and service | Replace parts that fail, update logbook. |
Logbooks must stay on-site for seven years; several jurisdictions now accept digital copies provided a signed hard-copy summary is available during audits.
Picking the right hardware
Part 3 sets tight photometric and durability bars. A compliant exit sign must meet prescribed green chromaticity and stay legible through moderate smoke. LED technology has made those targets easier to meet while slashing power and replacement labour.
Wholesalers offer a broad catalogue that fits straight into AS 2293 layouts:
- Low-profile led battens wholesale lines suit car-parks and plant rooms.
- Decorative fittings such as led oysters wholesale improve aesthetics in lobbies without sacrificing performance.
- For new builds chasing a flush ceiling, led recessed light wholesale products hit the uniformity tables with minimal glare.
Check that any chosen luminaire carries a current compliance test report and an on-board self-test indicator—both save time during Part 2 inspections.
Four common slip-ups
- Spacing templates copied blindly – once walls move or surface reflectance changes, an old plan can breach the 0.2 lux rule. Re-run the photometry.
- Battery fatigue – nickel–cadmium fades gracefully; lithium often fails abruptly. The six-monthly discharge is the only reliable warning.
- Visual clutter – animated displays and RGB feature lights can obscure exit signs. Maintain colour contrast and clear sightlines.
- Paperless but not payable – electronic logs are fine, yet auditors may still want to sign a physical sheet. Keep both.
Manager’s checklist
- Schedule discharge tests after hours to avoid blackouts during trade.
- Tag each fitting so inspectors can scan and auto-populate the log.
- Stock spare drivers from the same batch to guarantee photometric consistency.
- Budget for whole-of-system renewal every 8-10 years; LED chips last, but plastics yellow and batteries time-out.
What’s on the horizon?
Standards Australia is reviewing glare metrics and hybrid photoluminescent options, while regulators weigh shorter test intervals for high-risk sites such as tunnels. Staying alert to these tweaks—and choosing luminaires with firmware that can adapt—will prevent last-minute scrambles when the next amendment lands.
Smart testing and future-proofing
Self-testing luminaires can trigger their own discharge cycles and email a report, cutting technician hours and making audits transparent. AS 2293 recognises electronic records so long as a competent person signs them off each year. Pick fittings with clip-in battery cartridges and NFC firmware updates. You pay a little more now, yet you swap a battery, not an entire light, and you stay ready when the standard tightens again.
Emergency lighting rarely grabs headlines, yet it becomes the only thing that matters when smoke fills a corridor. Apply AS 2293 thoroughly, keep the logbook honest, and occupants will reach the street without hesitation.

